As surging temperatures had unsparingly beaten down energy facilities in this year’s El Niño stricken summer months, the Energy Regulatory Commission (ERC) indicated that ‘heat wave’ will be added as metrics in determining the reliability indices for power facilities, primarily the electric generating assets.